An improved learning environment for children and young people is at the heart of the Council’s proposal for a new Tobermory Campus.

This document summarises the key findings of HMIE’s report on the relocation proposal and the Education Service’s response to that. The Council’s Consultation Report provides full details, including a detailed analysis of all other feedback gathered during the statutory consultation. It is available at the following link: School consultations and proposals

A new home for the existing campus

The proposal is to relocate the existing Tobermory 2-18 Campus to a new, purpose-built building at Tobermory South. It does not involve:

  • school closures
  • moving associated primary schools into the campus
  • changing the campus leadership and management structure, nor
  • changes to the current catchment areas.

(ABC Consultation Report reference section 4.5; section 11:5 and section 11.3).

Why a new campus matters

The existing campus is rated C – poor for suitability. The Council and HMIE agree that replacement is needed. A modern campus offers the opportunity to improve learning spaces and support wellbeing, attainment and achievement. (ABC Consultation Report references section 4.5; section 11.5; and section 11.7)

An open opportunity to have a say

The statutory consultation was open to everyone — not just those living within the Tobermory Campus catchment. Anyone could participate and submit their views, including people elsewhere on Mull and beyond.

While the legislation identifies specific schools and groups that the Council was required to consult, this did not restrict the wider public’s opportunity to contribute. The Council therefore disagrees with HMIE’s statement that people outside the catchment were not included. This public consultation was a follow on from earlier multi-island community engagement undertaken in 2024 before the preferred site was selected. (ABC Consultation Report reference section 11.2)

Children’s rights: awareness, voice and participation

The United Nations Convention on the Rights of the Child (UNCRC) is an important part of the Council’s approach. The Proposal Paper describes accessible, age-appropriate information about children’s right to express their views freely, with those views given due weight in reviewing the proposal.

Pupils at affected schools were consulted using age appropriate materials and support where needed. Earlier engagement also included children from the Ross of Mull. Listening to children does not mean every child will agree with the outcome, but their views will be considered by decision makers. (ABC Consultation Report references section 7.3–7.6; section 11.10; Appendix 1, pupil consultation)

Building on an assessed site choice

The Council selected Tobermory South in March 2025 following extensive technical, financial and operational assessment. Members had already ruled out a split-site option in December 2024 on educational and financial grounds.

In addition, following a Judicial Review challenge to the preferred-site decision, Lord Cubie recognised that the earlier decision to retain a single 2-18 campus had been justified on educational and financial grounds, making discussion of a split site redundant. (ABC Consultation Report references sections 11.5–11.6; section 11.11; judgment paragraph 138)

Better spaces for pupils and families

Expanded early learning and childcare, specialist teaching and vocational spaces are intended to provide a broader range of learning facilities. The Council’s focus is on spaces that support the full curriculum, rather than classroom numbers alone.

A dedicated Learning Centre for pupils with additional support needs (ASN), accessible play and outdoor learning are intended to support more inclusive learning and participation.

A larger sports hall, seven-a-side 3G pitch, community library and fitness suite will support learning, leisure and social activity beyond the school day. The impact assessment identifies potential benefits for local groups and family activities.

(ABC Consultation Report references section 11.7; section 12.3; Appendix 2)

Inclusion and compliance guide the work

The report’s impact assessment identifies the Council’s duty to act compatibly with the UNCRC requirements incorporated into Scots law when exercising relevant functions. It supports consideration of children’s rights in decision-making.

The Council confirms that the new campus will be designed to comply with its Accessibility Strategy and the Equality Act 2010, supporting learners with disabilities and additional support needs. The Council will consider familiarisation visits, accessible information and individually tailored transition support, with staff working alongside children and families at relevant stages of the project.

Children’s rights impacts will remain as a key consideration as design, transport and operating arrangements develop, including any barriers to attendance, after-school activities and community facilities. (ABC Consultation Report references section 12.3; Appendix 2, children’s rights and wellbeing assessment)

Safe journeys are part of the design

Access and transport are integral to the ongoing work. This includes considering bus pull-in and pupil drop-off areas, parking, safe pedestrian movement, and walking and cycling connections. Details will be developed through design and planning. (Consultation Report reference section 11.8)

Developing the detail responsibly

The Council is following a staged design process and discussing possible funding flexibilities with the Scottish Government. Additional facilities are not yet confirmed. It also notes that the HMIE Report on wider whole-island approaches is outside the scope of this statutory consultation. (ABC Consultation Report references sections11.5; section 11.7; section 11.9)

Why the Council recommends moving forward

Having reviewed consultation feedback and HMIE’s report, officers consider that the benefits outweigh the possible disadvantages and recommend implementing the proposal. The Council acknowledges concerns and maintains that its processes were fair and compliant. If approved, relocation would take place once the new campus is complete forecast for 2031. (ABC Consultation Report references sections 11.11; section 12.4; section 14.1; section 15.1)

Next Steps toward a modern Tobermory Campus


Decision to Pause works - September 2025

The Council remains committed to building a new high-quality campus on Mull

  • On 10th June 2025 a petition on behalf of Mull Campus Working Group ltd was served on Argyll and Bute Council seeking a judicial review (JR) of the Council decision on 7th March 2025 in respect of the preferred site for the Mull Campus Project. Argyll and Bute Council are contesting the judicial review, and a hearing is due to take place on 13th October with a final outcome expected by the end of the year.
  • To avoid any potential risk of wasting public funding, by carrying out works that could be ruled out by a judicial review, Argyll and Bute Councillors have endorsed plans to temporarily pause all project work until an outcome is reached.
  • Construction inflation is running at approximately 3.5% per annum and between 0.5% and 0.7% a quarter. On a £40million capital investment this equates to £100,000 to £120,000 for every month of delay (source Building Cost Information Service (BCIS) February 2025)

Site Selection

  • Feedback received from the 3-week period of Community Engagement in September and October 2024 was used to inform the selection criteria used to assess shortlisted sites and provided the basis for the Integrated Impact Assessments carried out to inform the Council’s decision on 7th March 2025
  • Land purchase is just one small element of the total project cost, accounting for 1- 1.5% of the overall budget
  • The preferred site, Tobermory South, can accommodate the full footprint and external space required for the campus including expansion room and a 7-aside pitch (larger than the existing pitch)

Education Benefits

  • The design of the new campus would deliver significant educational benefits, as well as promote accessible and inclusive learning to meet the needs of all learners including those with Additional Support Needs. It will be designed to be an inspiring learning environment which is fully able to support new and innovative digital learning, provide an improved outdoor learning environment and engage pupils with the curriculum.
  • The new building will also provide excellent facilities for use outwith school hours that could be used to help meet the learning, leisure and social needs of the children and young people and the community

Catchment Area

  • As of March 2025, 84% of secondary aged children on Mull are within the existing Tobermory High School catchment
  • As of March 2025, 30% of primary and 40% of secondary age children walk to the current Tobermory 2-18 campus. If a central site was chosen, this would reduce to less than a handful
  • 4 additional buses would be required to transport children to a central site, at an estimated additional cost of £222k per annum
  • A central site would treble the total vehicle miles and carbon emissions compared to a Tobermory location

Economic Benefit

  • An economic assessment has been carried out and a campus in Tobermory is forecast to deliver £3.1m greater economic benefit to Mull in comparison to a central location