Works were carried out to strengthen Kilennan Bridge after it was damaged during a severe weather event in December 2024.
Works included:
- Construction of three new reinforced concrete aprons for the scoured abutment and two central piers.
- Scour protection to the Upstream embankment.
- River Invert repairs using locally sourced stone and a reinforced concrete slab.
- Clearance of the build up of gravel material to all spans.
Image
After works were complete
Image
Prior to works starting.
Image
Kilennan Bridge after the storm and before work began.