Issue details

SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: TO CONSTRUCT AND OPERATE A 132/275 KILOVOLT (KV) GIS SUBSTATION AND ASSOCIATED INFRASTRUCTURE THAT WILL CONNECT THE EXISTING 132 KV OVERHEAD LINE (OHL) FROM TAYNUILT TO INVERARAY TO A PROPOSED 275 KV OHL TO D