Minutes:
The Planning Officer spoke to the terms of the report. The application is for a single 3-bed dwelling
in the private rear garden of a large, detached 2 storey sandstone villa within
Upper Helensburgh Conservation Area and the established settlement area of
Helensburgh.
A total of 16 objections and 4 representations have been received. It is considered that the proposed
development is in accordance with all the relevant provisions of NPF4 and the
Argyll and Bute Local Development Plan 2 and that all the material land-use
planning issues arising are not unduly complex.
As such it is not considered that a hearing would add value to the
determination process.
It was recommended that planning permission be granted subject to the
conditions and reasons detailed in the report.
Decision
The Committee agreed to grant planning permission subject to the
following conditions and reasons:
Standard
Time Limit Condition (as defined by Regulation)
Standard Condition on Soil
Management During Construction
Additional Conditions
1.
PP - Approved Details & Standard
Notes – Non EIA Development
The
development shall be implemented in accordance with the details specified on
the application form dated 23rd November.2023, supporting
information and, the approved drawings listed in the table below unless the
prior written approval of the planning authority is obtained for an amendment
to the approved details under Section 64 of the Town and Country Planning
(Scotland) Act 1997.
|
Plan Title. |
Plan Ref. No. |
Version |
Date Received |
|
Location Plan |
2954/100 |
Revision A |
28.11.2023 |
|
Existing Site Topography
showing Retained and Removed Trees |
2954/101 |
Revision B |
12.02.2024 |
|
Elevations, Site Plan,
Floor Plana and Section |
2954/110 |
Revision A |
07.03.2024 |
Reason: For the purpose of clarity, to
ensure that the development is implemented in accordance with the approved
details.
2.
PP – Timescale to be Agreed for
Completion
No
development shall commence until details of the proposed timescale for
completion of the approved development have been submitted to and approved by
the Planning Authority. Such details
shall include a phasing scheme for the implementation of the development in
stages and shall include a plan differentiating each distinct phase of the
development and a schedule detailing the sequence in which development is to be
implemented.
Thereafter,
the development shall be implemented in accordance with the duly approved
timescale and phasing scheme unless an alternative timescale or an amendment to
the agreed sequence/timing of development is subsequently agreed in writing by
the Planning Authority.
Reason:
To ensure the development is implemented on a progressive basis having regard
to infrastructure and servicing requirements and in order to comply with the
requirements of NPF4 Policy 16F.
3.
PP - Junction with public road:
Notwithstanding
the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing 08/002B with the
exception of the width of the driveway which is specified below; and in
accordance with the following requirements:
i.
visibility
splays of 2.4 metres to point X by 24
metres to point Y from the centre line of the proposed access measured
from the rear of the grass verge/line of the front face of the existing
boundary wall;
ii.
a
pedestrian visibility splay of 2.4 metres to point X by 2.4 metres to point Y
from the centre line of the proposed access;
iii.
minimum
driveway access width of 3.7 metres for the first 10 metres;
iv.
the
first 5.0 metres of the access shall be surfaced with a bound material, such as
bitumen macadam or concrete, or any alternative material that has been
submitted to and approved in writing by the planning authority in consultation
with the road authority, prior to the final wearing surface being laid.
v.
the
proposed private access shall be graded, where possible, and designed to
incorporate surface water run-off from the access that drains within the
application site in order to prevent water and debris run-off onto the public
road.
Prior to work starting on site the
access hereby approved shall be formed to at least base course standard and the
visibility splays shall be cleared of all obstructions such that nothing shall
disrupt visibility from a point 1.05 metres above the access at point X to a
point 0.6 metres above the public road carriageway at point Y.
The
final wearing surface on the access shall be completed prior to the development
first being brought into use and the visibility splays shall be maintained
clear of all obstructions thereafter.
Reason:
In the interests of road safety.
4.
PP - Parking and Turning As Shown
The
parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans unless an alternative layout for parking
and turning is approved in writing by the Planning Authority in consultation
with Area Roads prior to the commencement of development.
The
approved scheme shall be completed in accordance with the approved details
prior to the development first being occupied and shall thereafter be
maintained clear of obstruction for the parking and manoeuvring of vehicles.
Reason:
In the interest of road safety.
5.
PP - Electric Vehicle Charging –
Residential with off street parking
Prior
to the commencement of the development (or such other timescale as may be
agreed in writing with the Planning Authority), a scheme detailing the
provision of a minimum 7kw electric vehicle charging point shall be submitted
to and approved in writing by the Planning Authority. Where charging cannot be
provided then the appropriate ducting to future proof the property must be
installed.
The
approved charging point, or where relevant, the approved cable ducting shall be
installed in full prior to the first occupation of the development, and
thereafter retained in perpetuity unless otherwise agreed in writing by the
planning authority
Reason:
to comply with the provisions of NPF4 Policy 13 Sustainable Transport and LDP2
Policy 34 – Electric Vehicle Charging.
6.
PP – Submission of Details / Samples
Notwithstanding
the effect of Condition 1, no development shall commence until full details
and/or material samples, where specified (below) have been submitted to and
approved in writing by the Planning Authority. The details/samples shall
include the following:
i.
samples
of the natural stone to be used in the development and written details of the
size and coursing and, means of pointing of all stone work:
ii.
manufacturers
specifications for the natural roof slates and all rainwater goods:
iii.
details
of the surface finish/colour for the fascias and
window/door frames: and,
iv.
details
of the coping for the skews, unless this is proposed to be natural stone
subject to the provisions of 4 (i) above:
v.
details
for the hard surfacing of the parking/turning area and paving for paths and
terraces.
The development shall thereafter be
completed using the approved specifications or such alternatives as may be
agreed in writing with the Planning Authority.
Reason:
In order to integrate the development into its historic context and to ensure
that the proposed development will preserve enhance or support the character
and appearance of the conservation area.
7.
PP – Submission of Further Details for
the Proposed Gateway/Gate
Notwithstanding
the effect of Condition 1, no development shall commence until full details of
the proposed new gateway, including the new gate piers, and the proposed gates
are submitted to and approved in writing by the planning authority.
Thereafter
the development shall be completed in accordance with the approved details or
such alternatives as may be agreed in writing with the Planning Authority.
Reason:
In order to integrate the development into its surroundings, to preserve the
character and integrity of this historic stone boundary wall and to ensure that
the development preserves, or where possible enhances the character and
appearance of the conservation area.
8.
PP – Tree Retention and Protection
No
development shall commence until a scheme for the retention and safeguarding of
trees during construction has been submitted to and approved by the Planning
Authority. The scheme shall comprise:
i.
Details
of all trees to be removed and the location and canopy spread of trees to be
retained as part of the development;
ii.
A
programme of measures for the protection of trees during construction works
which shall include fencing at least one metre beyond the canopy spread of each
tree in accordance with BS 5837:2012 “Trees in Relation to Construction”.
Tree protection measures shall be
implemented for the full duration of construction works in accordance with the
duly approved scheme. No trees shall be lopped, topped or felled other than in
accordance with the details of the approved scheme unless otherwise approved in
writing by the Planning Authority.
Reason:
In order to retain trees as part of the development in the interests of
preserving/enhancing the character and appearance of the conservation area and
the amenity and nature conservation.
9.
PP – Full Landscaping Scheme
No
development shall commence until a scheme of boundary treatment, surface
treatment and landscaping has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule
which shall include details of: Amended March 2023 to include additional
biodiversity element for NPF4 condition 3C
(i)
Existing and proposed ground levels
in relation to an identified fixed datum;
(ii)
Existing landscaping features and
vegetation to be retained;
(iii) Location
design and materials of proposed walls, fences and gates;
(iv) Proposed
soft and hard landscaping works including the location, species and size of
every tree/shrub to be planted;
(v)
A biodiversity statement
demonstrating how the proposal will contribute to
conservation/restoration/enhancement of biodiversity, and how these benefits
will be maintained for the lifetime of the development;
(vi) A
programme for the timing, method of implementation, completion and subsequent
on-going maintenance.
All of the hard and soft landscaping
works shall be carried out in accordance with the approved scheme unless
otherwise approved in writing by the Planning Authority.
Any
trees/shrubs which within a period of five years from the completion of the
approved landscaping scheme fail to become established, die, become seriously
diseased, or are removed or damaged shall be replaced in the following planting
season with equivalent numbers, sizes and species as those originally required
to be planted unless otherwise approved in writing by the Planning Authority.
The biodiversity statement should refer to Developing with Nature guidance | NatureScot as appropriate.
Reason:
To assist with the integration of the proposal with its surroundings in the
interest of preserving or enhancing the character and appearance of the
conservation area and contributing to biodiversity.
10.
PP – Submission of Finished Floor Levels
No
development shall commence until details of the proposed finished ground floor
level of the development relative to an identifiable fixed datum located outwith the application site have been submitted to and
approved in writing by the Planning Authority. The development shall be
implemented in accordance with the approved details.
Reason:
In order to secure an acceptable relationship between the development and its
surroundings.
11.
PP – Surface Water Drainage – Further
detail required
Notwithstanding
the provisions of Condition 1, no development shall commence until full details
of the intended means of surface water drainage to serve the development have
been submitted to and approved in writing by the Planning Authority.
The
duly approved scheme shall be implemented in full concurrently with the
development that it is intended to serve and shall be operational prior to the
occupation of the development and maintained as such thereafter.
Reason:
To ensure the provision of an adequate surface water drainage system and to
prevent flooding.
12.
PP – Restriction of
Engineering/Construction Activity by Time
Notwithstanding
the provisions of Condition 1, no engineering and/or construction activity,
including the unloading of vehicles shall be take place on the site outwith the hours of 08:00 till 18:00 on weekdays; 09:00 –
13:00 on Saturdays. No engineering and/or construction activity shall be
carried out at any time during Sundays and Bank Holidays.
Reason:
In order to protect the amenity of the area.
13.
PP – Construction Management Plan -
Protection of Grass Verges
Notwithstanding
the provisions of condition 1, no development shall commence until a Construction
Management Plan has been submitted to and approved in writing by the Planning
Authority. The Management Plan should clearly indicate all grass verges on the
west side of Campbell Street and the south side of Barclay Drive adjacent to
the application site and provide details of how these grass verges (with the
exception of the proposed private access as identified on the approved
drawings), are to be protected from construction-related damage including, but
not exclusively to vehicular movements; storage of spoil and/or materials.
Thereafter,
the construction phase shall be carried out in full accordance with the
approved plan and the grass verges adjacent to the application site, with the
exception of the private driveway identified on the approved drawings, retained
in their present condition in perpetuity.
In
the event of any accidental damage to the aforesaid grass verges to Campbell
Street and/or Barclay Drive, the applicant/developer shall re-instate the grass
and soil to the condition of the verges prior to commencement of development.
Reason:
In order to retain the grass verges in the interests of preserving local visual
amenity and the character and appearance of this part of the conservation area.
(Report by Head of
Development and Economic Growth dated 6 June 2024, submitted)
Supporting documents: