Agenda item

ROSNEATH FARMS LTD: SITE FOR THE ERECTION OF DWELLINGHOUSE: PLOT 7, LAND TO THE REAR OF LOCHEWE AND ARDLANISH, KILGREGGAN, HELENSBURGH (REF: 21/00349/PPP)

Report by Head of Development and Economic Growth

Minutes:

The Planning Officer spoke to the terms of the report and to supplementary report number 1 which advised of further representations received on 13 February 2023 and the submission of a supporting statement from the Applicant’s Agent in response to the issues raised. 

 

The proposed site is situated within the minor settlement boundary for Portkil as designated in the Argyll and Bute Local Development Plan 2015.  Subject to appropriate safeguarding conditions to secure the appropriate siting and design of a modest dwellinghouse within the site, the site is considered to represent an appropriate opportunity for development within the defined Rural Opportunity Area (ROA) consistent with the relevant provisions of the Development Plan and there are no other material considerations of sufficient significance to indicate that it would be appropriate to withhold planning permission having regard to Section 25 of the Act.  Also subject to commensurate improvements to the existing private access road, it is considered that the proposal can be served by an appropriate private and public road regime.

 

It was recommended that planning permission in principle be approved subject to the conditions and reasons detailed in the report.

 

Decision

 

The Committee agreed to grant planning permission in principle subject to the following conditions and reasons:

 

1.    PPP - Standard Condition & Notes 1

 

Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7 and 8 below shall be submitted by way of application(s) for Approval of Matters Specified in Conditions in accordance with the timescales and other limitations in Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the development shall be completed wholly in accordance with the approved details.

 

Reason: In accordance with Section 59 of the Town and Country Planning (Scotland) Act 1997 (as amended).PP - Approved Details & Standard Notes – Non EIA Development.

 

2.    PPP - Approved Details & Standard Notes 2

 

The development shall be implemented in accordance with the details specified on the application form dated 17th February 2021, supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997.

 

Plan Title.

Plan Ref. No.

Version

Date Received

Location Plan

PL–657-00

-

18.02.21

Location Plan and Existing & Proposed Site Plan

PL–657-01

-

18.02.21

 

Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details.

 

3.    Design and Finishes

 

Pursuant to Condition 1 – no development shall commence until plans and particulars of the site layout, design and external finishes of the development have been submitted to and approved by the Planning Authority. These details shall incorporate:

 

(i)      A statement addressing the Action Checklist for developing design contained within the Argyll and Bute Sustainable Design Guide 2006;

(ii)     Taking consideration of the Sustainable Siting and Design Principles set out in the adopted ‘Argyll and Bute Local Development Plan’ 2015;

(iii)    Single or single storey with accommodation in the roof space;

(iv)   A house siting, scale and plan form that responds clearly to the natural contours of the site in order that the proposed built development ‘hunkers down’ into the prevailing landform and minimises intrusive cut and fill excavation;

(v)    Building scale, massing and form that reflects, or sympathetic to the existing pattern of built development in the immediate vicinity;

(vi)   Narrow span volumetric form with symmetrically pitched roof angled between 37 and 42 degrees finished in natural slate or good quality artificial slate, unless an alternative roof form/design/materiality can be demonstrated as an acceptable alternative solution to the satisfaction of the planning authority by means of a comprehensive Design Statement;

(vii)  External walls finished in wet dash render, smooth render, natural stone, timber or a mixture of these finishes unless an alternative material cladding strategy can be justified by means of a Design Statement to the satisfaction of the planning authority;

(viii) Window openings with a vertical emphasis unless alternative opening proportions can be justified as an integral part of a robust design process and justified by means of a Design Statement to the satisfaction of the planning authority.

(ix)   Existing and proposed sections through the site to demonstrate that the dwellinghouse will be sited in a manner sympathetic to the wider landscape impact of the area.

(x)    Existing topographical survey and proposed site plan showing ground levels and finished floor levels (FFLs) relative to an identified fixed datum point located close to but outwith the application site.

 

Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended, and in order to integrate the proposed dwellinghouse with its surrounds.

 

4.    Pursuant to Condition 1, no development shall commence until plans and details showing the following works to the vehicular access, including the existing private access road from the junction of the proposed new access to the proposed site for a dwellinghouse to the junction with the B833 public road, and parking regime to serve the proposed development are submitted to and approved in writing by the Local Planning Authority:

 

(i)    Access at connection between the development site and the private access track to be constructed in accordance with Council’s Roads Standard Detail Drawing SD 08/004a.

(ii)   Commensurate improvements to the existing private access road/track to provide a continuous 5.5 metre adoptable carriageway width between the junction of the Rosneath road (B833) and the private access to the proposed dwellinghouse, including a 2 metre wide service strip/grass verge;

(iii)  Parking provision commensurate with the size of dwellinghouse proposed in accordance with SG LDP TRAN 6 and the Car Parking Standards of the adopted ‘Argyll and Bute Local Development Plan’ 2015.

 

Prior to commencement of any works on the application site:

 

(i)    The commensurate improvements to the private access road from the access point to the proposed dwellinghouse to the junction with the Rosneath road (B833), as specified above, shall be completed, and written confirmation that the improvements have been implemented to an adoptable standard has been issued by the planning authority in consultation with the Council’s Roads and Infrastructure Services.

(ii)   The approved scheme of works in respect of the junction layout at the connection between the private site access and the private track shall be formed to at least type 1 base course standard and the visibility splays shall be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05 metres above the junction at point X to a point 0.6 metres above the public road carriageway at point Y. The final wearing surface on the improved private access and passing place shall be completed prior to the development first being occupied and the visibility splays shall be maintained clear of all obstructions thereafter.

 

The approved parking and turning layout shall be implemented in full prior to the development first being occupied and shall thereafter be maintained clear of obstruction for the parking and manoeuvring of vehicles.

 

Reason: To ensure that the proposed development can be served by an appropriate private/public road regime and in the interests of road safety in accordance with the provisions of the Argyll and Bute local Development Plan – 2015 and policies 35, 36, 37 and 39 of the emerging Proposed Argyll and Bute Local Development Plan 2.

 

5.    No development or other work shall be carried out on the site until a pre-commencement survey for the presence of protected species has been carried out by an appropriately qualified person and has been submitted for the written approval of the Planning Authority in consultation with NatureScot. In circumstances where species of interest are identified as being present, or at risk from construction works, the survey shall further provide suggested avoidance and or mitigation measures, including timing constraints, to address such presence or risk. The development shall be implemented in accordance with the measures identified in the duly approved scheme.

 

Reason: In order to establish that the circumstances of the site have not changed significantly between approval and implementation of the development for the purpose of protecting natural heritage assets in the interest of nature conservation.

 

6.    PPP – Archaeological Watching Brief

 

Pursuant to Condition 1 - no development or ground breaking works shall commence until a method statement for an archaeological watching brief has been submitted to and approved by the Planning Authority in consultation with the West of Scotland Archaeology Service.

 

The method statement shall be prepared by a suitably qualified person and shall provide for the recording, recovery and reporting of items of interest or finds within the application site.

 

Thereafter the development shall be implemented in accordance with the duly approved details with the suitably qualified person being afforded access at all reasonable times during ground disturbance works.

 

Reason: In order to protect archaeological resources.

 

7.    PPP – Full Landscaping Scheme

 

Pursuant to Condition 1 – no development shall commence until a scheme of boundary treatment, surface treatment and landscaping has been submitted to and approved by the Planning Authority. The scheme shall comprise a planting plan and schedule which shall include details of:

 

(i)    Existing and proposed ground levels in relation to an identified fixed datum;

(ii)   A tree survey including a site plan accurately showing the location and species of existing trees within the site and identifying those to be retained and those to be felled;

(iii)  A proposed scheme for the planting of a substantial tree belt along the south eastern edge of the application site boundary including an appropriate mix of deciduous species, sizes and planting densities;

(iv) Location design and materials of proposed walls, fences and gates;

(v)  Proposed soft and hard landscaping works including the location, species and size of every tree/shrub to be planted;

(vi) A programme for the timing, method of implementation, completion and subsequent on-going maintenance.

 

If it is not possible to provide a suitably deep tree buffer zone within the planning application site boundary then a tree belt shall be provided in the adjacent field alongside the south eastern boundary of the application site.

 

All of the hard and soft landscaping works shall be carried out in accordance with the approved scheme unless otherwise approved in writing by the Planning Authority.

 

Any trees/shrubs which within a period of five years from the completion of the approved landscaping scheme fail to become established, die, become seriously diseased, or are removed or damaged shall be replaced in the following planting season with equivalent numbers, sizes and species as those originally required to be planted unless otherwise approved in writing by the Planning Authority.

 

Reason: To assist with the integration of the proposal with its surroundings in the interest of amenity.

 

8.    PPP – Details of New Private Foul Drainage System

 

Pursuant to Condition 1 – no development shall commence until details of the proposed means of private foul drainage to serve the development have been submitted to and approved by the Planning Authority.

 

The duly approved scheme shall be implemented in full concurrently with the development that it is intended to serve and shall be operational prior to the occupation of the development.

 

Reason: To ensure that an adequate means of foul drainage is available to serve the development.

 

9.    Sustainable Drainage System

 

Notwithstanding the provisions of Condition 2, the development shall incorporate a surface water drainage system which is consistent with the principles of Sustainable urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS Manual C753 and Sewers for Scotland 4th Edition with post development runoff not exceeding the greenfield runoff rate.  The requisite surface water drainage shall be operational prior to the development being brought into use and shall be maintained as such thereafter.

 

Reason: To ensure the provision of an adequate surface water drainage system and to prevent flooding.

 

(Reference: Report by Head of Development and Economic Growth dated 6 February 2023 and supplementary report number 1 dated 14 February 2023, submitted)

Supporting documents: