Report by Head of Development and Economic Growth
Minutes:
The Planning Officer spoke to the terms of the report and to supplementary report number 1. The application site lies within the Countryside Zone where policy LDP DM 1 will only support proposals that are infill, redevelopment, rounding off or change of use. In this case the conversion of the church building and partial use of the adjacent field for associated domestic purposes is considered to be consistent with the settlement and spatial strategy. The Council own the graveyard which completely surrounds the church. The proposed external alterations to convert the church into a mainstream dwellinghouse are considered to be minimal and the physical appearance and character of the church would be relatively untouched. The proposal has attracted a total of 19 letters of objection, including 5 late representations detailed in the supplementary report. The concerns raised relate to the use of the church building as a dwellinghouse, impact on existing amenity and privacy as a historic and functional graveyard, access and car parking issues and serving issues. There have been no objections from consultees subject to conditions. It is not considered that holding a discretionary hearing would add value to the planning process. The proposal is considered to be consistent with the relevant development plan policies and it was recommended that planning permission be granted subject to the conditions and reasons detailed in the report of handling.
Decision
The Committee agreed to grant planning permission subject to the following conditions and reasons:
1.
The
development shall be implemented in accordance with the details specified on
the application form dated 25th April 2019 and the approved drawings
listed in the table below, and supporting information, unless the prior written
approval of the planning authority is obtained for an amendment to the approved
details under Section 64 of the Town and Country Planning (Scotland) Act 1997.
Plan Title. |
Plan Ref. No. |
Version |
Date Received |
1:10,000 Supplementary Location Plan |
1 of 14 Drawing no. 1365-02-14E |
RevE |
04/08/2020 |
1:1250 Location Plan |
2 of 14 Drawing no. 1365-02-01F |
RevF |
04/08/2020 |
1:500 Site Plan as Existing |
3 of 14 Drawing no. 1365-02-02G |
RevG |
04/08/2020 |
1:100 Ground Floor Plan as Existing |
4 of 14 Drawing no. 1365-02-04A |
RevA |
26/04/2019 |
1:100 First Floor Plan as Existing |
5 of 14 Drawing no. 1365-02-05A |
RevA |
26/04/2019 |
1:100 Elevations as Existing |
6 of 14 Drawing no. 1365-02-06A |
RevA |
26/04/2019 |
1:100 Sections as Existing |
7 of 14 Drawing no. 1365-02-07 |
|
26/04/2019 |
nts 3D Views as Existing |
8 of 14 Drawing no. 1365-02-08 |
|
26/04/2019 |
1:500 Site Plan as Proposed |
9 of 14 Drawing no. 1365-02-03G |
RevG |
04/08/2020 |
1:100 Ground Floor Plan as Proposed |
10 of 14 Drawing no. 1365-02-09A |
RevA |
26/04/2019 |
1:100 First Floor Plan as Proposed |
11 of 14 Drawing no. 1365-02-10A |
RevA |
26/04/2019 |
1:100 Elevations as Proposed |
12 of 14 Drawing no. 1365-02-11B |
RevB |
26/04/2019 |
1:100 Sections as Proposed |
13 of 14 Drawing no. 1365-02-12 |
|
26/04/2019 |
nts 3D Views as Proposed |
14 of 14 Drawing no. 1365-02-13 |
|
26/04/2019 |
Reason: For the purpose of clarity, to ensure that the development is
implemented in accordance with the approved details.
2.
Prior
to the commencement of any development, the existing private water supply and
infrastructure for storage and distribution will need to meet the requirements
of The Water Intended for Human Consumption (Private Supplies) (Scotland)
Regulations 2017 if it is to be used for the proposed development. The development itself shall not be brought
into use or occupied until the required supply has been installed in accordance
with the recommendations made in the submitted report by Highwater
Private Water Supplies – “Spring Water Supply Stronyaraig,
near Inverchaolain”, dated 28th November
2018.
Reason: In the interests of public health
and in order to ensure that an adequate private water supply in terms of both
quality and quantity can be provided to meet the requirements of the proposed
development and to protect existing supplies.
3. No development (including any tree
felling or land engineering works or any associated operations) shall take
place within the site until the developer has secured the implementation of an archaeological watching brief, to be
carried out by an archaeological organisation acceptable to the Planning Authority,
during all ground disturbance. The retained archaeological organisation shall
be afforded access at all reasonable times and allowed to record, recover and
report items of interest and finds. A method statement for the watching brief
will be submitted by the applicant, agreed by the West of Scotland Archaeology
Service, and approved by the Planning Authority prior to commencement of the
watching brief. The name of the archaeological organisation retained by the
developer shall be given to the Planning Authority and to the West of Scotland
Archaeology Service in writing not less than 14 days before development
commences.
Reason: In order to allow the recovery and recording
of any finds of archaeological significance.
4.
The
proposed shared vehicular access shall be designed and constructed with a
passing place that shall be constructed as per Standard Detail for private
driveway SD8004a Access from Single lane road. The access shall be designed and
constructed to prevent water running onto the public road. The car parking area
shall be designed with a turning area to allow vehicles to exit the site in a
forward manner. The access shall be constructed prior to any work commencing on
site, unless otherwise agreed in writing by the Planning Authority.
Reason: In the interests of road safety.
5. The dwellinghouse
hereby approved shall not be occupied until sightlines of 75 metres from a 2.4
metre setback onto the C10 serving the new domestic curtilage to the north of
the church site have been provided. Thereafter,
no obstruction to visibility (i.e. walls, fences and hedges) shall be
permitted within these visibility splays above a height of 1.0 metre from
ground level.
Reason: To achieve and maintain required sightlines
onto the C10 road.
6.
Prior
to the first occupation of the dwellinghouse, a parking area for a minimum of
four vehicles shall be provided within the application site (i.e. land to the
north of the graveyard) and thereafter be retained for such a dedicated
purpose, unless otherwise agreed in writing by the Planning Authority.
Reason: In the interest of traffic
and pedestrian safety.
7.
Any
trenches dug deeper than 50 cm shall have a ramp to allow any otters (and other
species) to exit.
Reason:
In order to minimise any potential impacts on otters and other species.
8.
Notwithstanding
the provisions of Condition 1, no development shall commence until details of
the intended means of surface water drainage to serve the development have been
submitted to and approved in writing by the Planning Authority.
The duly approved scheme shall be implemented in full
concurrently with the development that it is intended to serve and shall be
operational prior to the occupation of the development and maintained as such
thereafter.
Reason: To ensure the provision of an adequate surface water drainage system and to prevent surface water flooding.
9.
No
development shall commence until a scheme of tree planting, landscaping,
boundary treatment, surface treatment for new garden area, lay-by and car
parking and turning area has been submitted to and approved in writing by the
Planning Authority. The scheme shall comprise a planting plan and schedule
which shall include details of:
i)
Existing
landscaping features and vegetation to be retained;
ii)
Location
design and materials of proposed walls, fences and gates; Fence around new
domestic amenity space should be a post and rail stock proof fence to match
existing around the field, unless otherwise agreed in writing;
iii)
Proposed
soft and hard landscaping works including the location, species and size of
every indigenous tree/shrub to be planted; Tree species should include a mix of
Quercus sp. either Sessile Oak or Pedunculate
species with some intermittent planting of Birch (Betula
sp.) and Rowan (Sorbus sp.);
iv)
A
programme for the timing, method of implementation, completion and subsequent
on-going maintenance.
All of the hard and soft landscaping works shall be carried out in accordance with the approved scheme unless otherwise approved in writing by the Planning Authority.
Any trees/shrubs which within a period of five years from the completion of the approved landscaping scheme fail to become established, die, become seriously diseased, or are removed or damaged shall be replaced in the following planting season with equivalent numbers, sizes and species as those originally required to be planted unless otherwise approved in writing by the Planning Authority.
Reason: To assist with the integration of the proposal within is rural surroundings.
10. The existing stone boundary walls
forming the western and northern boundaries of the graveyard shall be retained.
No part of the wall shall be removed, altered or lowered without the written
approval of the planning authority.
Reason: In the interests of visual amenity and to
safeguard the character of the former Inverchaolain
Church and graveyard.
11. Unless otherwise agreed in writing by
the Planning Authority, all rooflights to be
installed shall be the ‘conservation type’ rooflight
window. Full details of all new rooflights shall be
submitted (including scaled plans) for the prior written approval of the
Planning Authority prior to their installation on the church building.
Reason: To safeguard the character of the
former Inverchaolain Church building.
12. Unless otherwise agreed in writing by
the Planning Authority, natural slates to be used for repairs or
re-roofing
Reason:
To safeguard the character of the former Inverchaolain
Church building.
13. Notwithstanding the provisions of The Town and Country Planning (General Permitted
Development) (Scotland) Amendment Order 2011, classes 3A, 3D and 3E, prior to the erection of any domestic outbuildings,
decking, gates or fences within the new amenity space area (i.e. land to the north of the
graveyard),
full details of siting, scale, design and materials shall be submitted for the
written approval of the Planning Authority.
Reason: In order to consider this aspect in detail
and in terms of assessing any potential impact on the setting of Inverchaolain Church graveyard and surrounding
dwellings.
14. For the avoidance of doubt, the
graveyard surrounding the former Inverchaolain Church
building shall remain publicly accessible at all times during the construction
phase and following completion of the development
Reason:
In
order to safeguard public access both during and after the construction phase
of the development.
15. No works shall commence until full
details of a Construction Environment Management Plan (CEMP) for all ground
engineering and construction works has been submitted to and approved in
writing by the Planning Authority in consultation with the Council’s Roads and
Amenity Services. Such plan shall, include a timetable for works shall
including full details of delivery times for materials and plant, construction
work operating hours, parking arrangements for construction traffic and
construction management protocol.
Reason: In order to safeguard
operation and maintenance of the graveyard from construction noise and
activities.
(Reference: Report by Head of Development and Economic Growth dated 31 October 2020 and supplementary report number 1 dated 17 November 2020, submitted)
Supporting documents: