Report by Head of Development and Economic Growth
Minutes:
The Planning Officer spoke to the terms of the report. The application site is located within the Key Rural Settlement zone of Strachur. The application seeks permission for the details required by Conditions 1-6 relative to Planning Permission in Principle reference 16/02522/PPP which was granted on 24 November 2016 and established the principle of development of the site for an approved layout of 18 dwellinghouses. As such there are no fundamental issues relating to the principle of the development which require to be examined, only the matters ‘reserved’ ie siting, design, external appearance, landscaping, access arrangements, proposed water supply and drainage requirements. Conditions 2 and 3 are time conditions relative to the submission of the AMSC application while condition 4 relates to the approved drawings on the previous permission. These have been satisfied by the submission of this AMSC application and are not directly relevant to the assessment of this application. Letters of objection from 18 individuals have been received The proposal conforms to the relevant development plan policies and there are no other material considerations, including issues raised by third parties, which would warrant anything other than the application being determined in accordance with the provisions of the development plan. It is considered that the matters specified in conditions 1-6 have been satisfactorily addressed by the details submitted for consideration of this application.
It is recommended that Approval of Matters Specified in Conditions be granted subject to the conditions and reasons detailed in the report of handling.
Decision
The Committee agreed to grant the Approval of Matters Specified in Conditions subject to the following conditions and reasons:
1. The development shall be implemented and managed in accordance with the conditions within the grant of planning permission in principle ref. 16/02522/PPP and in accordance with the details specified on the application form dated 12th November 2019; all supporting information; and the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997.
Plan Title. |
Plan Ref. No. |
Version |
Date Received |
Location Plan |
Drawing No. A4 1:2500 |
|
27/11/2019 |
Site Location Plan as Existing |
Drawing No. L(--)01 |
Rev C |
27/11/2019 |
Site Location Plan as Proposed |
Drawing No. L(--)02 |
Rev G |
03/07/2020 |
Ground Floor Site Plan as Proposed |
Drawing No. L(--)03 |
Rev H |
03/07/2020 |
House Type A1 Plans & Elevations |
Drawing No. L(--)10 |
|
27/11/2019 |
House Type A2 Plans & Elevations |
Drawing No. L(--)11 |
Rev A |
27/11/2019 |
House Type A3 Plans & Elevations |
Drawing No. L(--)12 |
|
27/11/2019 |
House Type A4 Plans & Elevations |
Drawing No. L(--)13 |
|
27/11/2019 |
House Type A5 Plans & Elevations |
Drawing No. L(--)14 |
|
27/11/2019 |
House Type A6 Plans & Elevations |
Drawing No. L(--)15 |
|
27/11/2019 |
House Type B1 Plans & Elevations |
Drawing No. L(--)20 |
|
27/11/2019 |
House Type B2 Plans & Elevations |
Drawing No. L(--)21 |
|
27/11/2019 |
House Type B3 Plans & Elevations |
Drawing No. L(--)22 |
Rev A |
27/11/2019 |
House Type B4 Plans & Elevations |
Drawing No. L(--)23 |
|
27/11/2019 |
House Type B5 Plans & Elevations |
Drawing No. L(--)24 |
Rev A |
27/11/2019 |
House Type B6 Plans & Elevations |
Drawing No. L(--)25 |
Rev A |
27/11/2019 |
House Type C1 Plans & Elevations |
Drawing No. L(--)30 |
Rev B |
14/02/2020 |
House Type C2 Plans & Elevations |
Drawing No. L(--)31 |
|
14/02/2020 |
Landscape Layout |
Drawing No. L01 |
Rev D |
27/11/2019 |
Proposed Drainage Layout |
Drawing No. J2762-C-04 |
Rev F |
16/07/2020 |
Reason: For the purpose of clarity, to
ensure that the development is implemented in accordance with the approved
details.
2.
The
access serving this site shall be a Road over which the public has a right of
access in terms of the Roads (Scotland) Act 1984, and shall be constructed in consultation
with the Council’s Area Roads Manager having regard to Roads Construction
Consent requirements which shall inform the final construction details, unless
the prior consent for variation is obtained in writing from the Planning
Authority.
Reason:
In order to ensure that provision is made for a service “road” commensurate
with the scale of the overall development and having regard to the status of
the proposed access as a residential service road.
3. Prior to the construction of the dwellinghouses,
sightlines of 75 metres from a 2.4 metre setback shall be provided from the
proposed main vehicular access onto the A886 Strachur
to Colintraive Road and no obstruction to visibility including walls, fences,
hedges, vegetation or physical structures shall be permitted thereafter within
the sightlines above a height of 1.0 metre from the level of the adjacent
highway.
Reason:
In the interests of road and public
safety, and to ensure that
appropriate sightlines onto the A886 Strachur
to Colintraive Road can be maintained.
4. The visibility splays required for the individual dwellinghouse accesses shall be a minimum of 20 metres in each direction from a 2 metre setback. All walls, hedges and fences within the visibility splays shall be maintained at a height not greater than 1.0 metre above the road. These accesses must be a sealed surface for the first 5 metres behind the kerbline to minimise any debris from being deposited onto the road, their gradient not to exceed 5% for the first 5 metres and 8% for the remainder. A system of surface water drainage may be required to prevent water running onto the new road and footway. Accesses to be a minimum of 15 metres away from junctions.
Reason: In the interests of road safety.
5. The vehicular access shall be constructed 5.5 metres wide with a 2.0 metre wide footways and verges. Dropped kerbing to be provided to assist the safe passage of passing pedestrian traffic. The gradient of the access not to exceed 5% for the first 5 metres and not to exceed an absolute maximum of 10% for the remainder. The footways to be 2 metres wide with dropped kerbing at the junctions to assist pedestrian movements.
Reason: In
the interests of road and pedestrian safety.
6. No dwellinghouse hereby approved shall be first occupied until its allocated parking spaces and turning head as shown on drawing ref. L(--)03 Rev H, has been constructed and made available for use and thereafter shall be retained for the parking of vehicles, unless agreed otherwise in writing with the planning authority. The allocated parking provision for the development will be based on 2no. spaces for each 2/3 bedroomed unit and 3no. spaces for 4 or more bedrooms.
Reason: In the interests of providing off-street car
parking and turning provision.
7. Notwithstanding the provisions of Article 2(4) and Class 2B(1) of Part 1 of the Town and Country Planning (General Permitted Development) (Scotland) Amendment Order 2011, no additional windows or other openings from habitable rooms shall be installed in the gable elevations of the dwellinghouses without prior written consent of the Planning Authority.
Reason: In order to prevent the inclusion of any
additional windows and other openings in side elevations, that could undermine
the privacy and amenity of adjacent dwellinghouses.
8. Any
trenches dug deeper than 50 cm shall have a ramp to allow any otters (and other
species) to exit.
Reason: In order to minimise
any potential impacts on otters and other species.
9. Where 12
months or more have elapsed between the timing of the Preliminary Ecological
Appraisal (PEA) and Preliminary Roost Assessment (PRA) surveys hereby approved,
and development commencing, further update survey(s) shall be undertaken on the
site to determine any changes in the reported presence of, or potential for,
any statutorily protected species, in particular for bats, otter, red squirrel,
badger, reptiles and amphibians. The said survey(s) shall thereafter be
submitted to and approved in writing by the Planning Authority before any
development commences on the site. As a result of the survey(s), any avoidance,
mitigation, enhancement or compensation measures required for any European
Protected Species and or protected species, shall be detailed in a Species
Protection Plan, which must be agreed in writing with the Planning Authority
before works commence on the site. The Species Protection Plan(s) shall reflect
the results of the updated survey(s) and
the recommendations made in the PEA and PRA Report dated 17 January
2020 or the most up to date report whichever is applicable and be implemented
in full as part of the development’s Construction Method Statement.
Reason: To ensure compliance with The
Conservation (Natural Habitats &c.) Regulations 1994 (as amended), the
Wildlife and Countryside Act (1981) as amended, the Protection of Badgers Act
(1992) as amended, and the Nature Conservation (Scotland) Act (2004).
10. No development shall commence unless and until the Planning Authority has approved in writing an independent Ecological Clerk of Works (ECoW) for the development [in consultation with SEPA]. The terms of the ECoW appointment shall include:
(i) A duty to monitor compliance with the ecological commitments provided in the PEA and PRA surveys dated 17 January 2020 or the most up to date report whichever is applicable;
(ii) A duty to monitor compliance with the Species Protection Plans contained within the development’s Construction Method Statement;
(iii) A duty to report to the construction project manager any incidences of non-compliance at the earliest practical opportunity;
(iv) A duty to maintain records of all ecological inspections and observations made on the site during construction, and make these records available to the Planning Authority when requested;
(v) A duty to report to the Planning Authority any incidences of non-compliance with ecological commitments at the earliest practical opportunity.
The
approved ECoW should be a Chartered Ecologist or be
reporting directly to a Chartered Ecologist, and will be appointed on these
approved terms throughout the period from 3 months prior to the commencement of
the development, throughout any period of construction activity.
Reason: To ensure compliance with all
recommendations and commitments made in the PEA and PRA Report dated 17 January
2020 or the most up to date report whichever is
applicable. The approved ECoW should be a
Chartered Ecologist or be reporting directly to a Chartered Ecologist, and will
be appointed on these approved terms throughout the period from 3 months prior
to the commencement of the development, throughout any period of construction
activity.
11.
Site
clearance activities, and where possible construction, must take place out with
the bird breeding season (March-July inclusive) unless pre-works checks have
been undertaken and recorded by the ECoW and the ECoW has given explicit advice that no breeding birds are
present.
Reason: To ensure compliance with the Wildlife
and Countryside Act (1981) as amended, the Nature Conservation (Scotland) Act
(2004), and recommendations made in the PEA and PRA Report dated 17 January
2020 or the most up to date report whichever is applicable.
12.
No
earlier than 3 months prior to the commencement of development, a detailed
survey of Invasive Non-Native Species (INNS) will be undertaken for the site,
and an Invasive Species Management Plan (ISMP) will be produced on the basis of
the findings of this survey. The Invasive Non-Native Species Management Plan
will be implemented in full as part of the development’s Construction Method
Statements.
Reason: To ensure compliance with the
Wildlife and Countryside Act (1981) as amended, the Wildlife and Natural Environment
(Scotland) Act (2011), and recommendations made in the PEA and PRA Report dated
17 January 2020 or the most up to date report whichever is applicable.
(Reference: Report by
Head of Development and Economic Growth dated 7 October 2020, submitted)