SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: ERECTION OF HIGH VOLTAGE ELECTRICITY SUBSTATION AND FORMATION OF ASSOCIATED ACCESS, LANDSCAPING, DRAINAGE AND MEANS OF ENCLOSURE: APPROXIMATELY 4 KM SOUTH WEST OF INVERARAY, 300M WEST OF DOUGLAS WATER AND UPS

Meeting: 24/05/2023 - Planning, Protective Services and Licensing Committee (Item 5)

5 SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC: ERECTION OF HIGH VOLTAGE ELECTRICITY SUBSTATION AND FORMATION OF ASSOCIATED ACCESS, LANDSCAPING, DRAINAGE AND MEANS OF ENCLOSURE: APPROXIMATELY 4KM SOUTH WEST OF INVERARAY, 300M WEST OF DOUGLAS WATER AND UPSLOPE OF THE EXISTING AN SUIDHE SUBSTATION, INVERARAY (REF: 22/02479/PP) pdf icon PDF 519 KB

Report by Head of Development and Economic Growth

:

Additional documents:

Minutes:

The Senior Planning Officer spoke to the terms of the report.  The proposal is for the erection of a 275kV gas insulated switchgear substation to connect into the recently completed overhead line between Inveraray and Crossaig.  The proposal is part of a number of infrastructure proposals to “maintain an efficient, co-ordinate and economical electrical transmission system” and is required to allow connection for renewable energy generation in the area across the wider electricity network.

 

It is considered that the proposal would accord with the principles and policies contained within the Local Development Plan and National Planning Framework 4 and is acceptable in terms of all other applicable in full with the material considerations.

 

It was recommended that planning permission be approved subject to conditions detailed in the report of handling.

 

Decision

 

The Committee agreed to grant planning permission subject to the following conditions and reasons:

 

1.    The development shall be implemented in accordance with the details specified on the application form dated 16th December 2022; the Environmental Appraisal (November 2022), supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997.

 

Plan Title.

Plan Ref. No.

Version

Date Received

Site Location Plan

A01

A01

13/01/2023

Figure 1.1 An Suidhe Substation Red Line Boundary

A01

A01

13/01/2023

Site Layout Plan

4534a-DR-P-0017

Rev.2

19/12/2022

Substation Compound Layout and Electrical Section Locations

4534a-DR-P-0004

Rev.3

13/01/2023

Proposed Site Access Profiles

4534a-DR-P-0021

 

07/12/2022

Proposed Site Profiles

4534a-DR-P-0018

Rev.1

07/12/2022

Site Access Details

4534a-DR-P-0008

Rev.1

07/12/2022

Typical Access Track Sections – Sheet 1

4534a-DR-P-0007

Rev.2

07/12/2022

Typical Access Track Sections – Sheet 2

4534a-DR-P-0012

Rev.2

07/12/2022

Typical Deer Fence and Gate

4534a-DR-P-0016

 

07/12/2022

2.5m High Security Palisade Fencing Details

CE/34/2015

Rev.E

19/12/2022

Electrical Layout Elevations 01

4534a-DR-P-0011

Rev.1

07/12/2022

Electrical layout Elevations 02

4534a-DR_P-0013

Rev.2

07/12/2022

Generator Building Elevations

4534a-DR-P-0009

Rev.2

07/12/2022

Generator Building Floor Plan

LT288 An SUIDHE_DIESEL_FLOOR

Rev.1

13/01/2023

Substation Building Elevations

4534a-DR-P-0006

Rev.2

07/12/2022

Substation Building Layout

4534a-DR-P-0005

Rev.1

07/12/2022

Transformer Building Elevations

4534a-DR-P-0019

 

07/12/2022

Transformer Building Layout

4534a-DR-P-0020

 

07/12/2022

An Suidhe Septic Tank and Private Water Supply Location

 

A01

13/01/2023

 

Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details.

 

2.    No construction works shall be commenced until a Finalised Construction Environmental Management Document [CEMD] has been submitted to and approved in writing by the Planning Authority, in consultation with SEPA and other consultees, as appropriate. The development shall then proceed in accordance with the approved CEMD unless otherwise agreed in writing by the Planning Authority. The CEMD shall include:

 

a)    An updated Schedule of Mitigation (SM) highlighting mitigation set out within each chapter of the Environmental Appraisal (EA), and the conditions of this consent;

b)    Processes to control/ action changes from the agreed SM;

c)    Construction Environmental Management Plans (CEMPs) for the construction phase covering:

 

i)             Habitat and species protection, including ECoW Details, surveys and species protection plans;

ii)            Landscape and Mitigation Restoration Plan including compensatory planting (refer to Condition 9);

iii)           Pollution prevention and control;

iv)           Dust management, including construction activity and vehicle movements;

v)            Construction noise and vibration

vi)           Temporary site lighting;

vii)         Watercourse crossings;

viii)        Site waste management

ix)           Surface and ground water management, including: drainage and sediment management measures from all construction areas including access tracks, mechanisms to ensure that construction will not take place during periods of high flow or high rainfall; and a programme of water quality monitoring;

x)            Soil Management and Peat Management Plan

xi)           Mapping of borrow pits and associated habitats identified for restoration;

xii)         Invasive Non-Native Species Management Plan

xiii)        Emergency Response Plans;

xiv)        Timetable for post construction restoration/ reinstatement of the temporary working areas and construction compound; and

xv)         Other relevant environmental management as may be relevant to the development

 

d)    A statement of responsibility to ‘stop the job/ activity’ if a breach or potential breach of mitigation or legislation occurs; and

e)    Methods of monitoring, auditing, reporting and the communication of environmental management on site and with client, Planning Authority, and other relevant parties.

 

Reason: To ensure protection of surrounding environmental interests and general amenity.

 

3.    No development shall commence until a Construction Traffic Management Plan (CTMP) and Phased Delivery Plan have been prepared and approved in writing by the Local Authority, in consultation with the Roads Authority, and Transport Scotland as the trunk roads Authority. The Plan shall include details of:

 

a)    Approved access routes,

b)    Agreed operational practises (including avoidance of convoy movements, specifying conduct in use of passing places, identification of turning areas, information of wheel cleansing facilities, signage to be installed on the A83 warning of construction traffic, signage or temporary traffic control measures to include for larger or abnormal loads, reporting of verge damage);

c)    The provision of an appropriate Code of Practice to drivers of construction and delivery vehicles.

d)    Abnormal load route surveys and finalised plan (including any accommodation measures required including the removal of street furniture, junction widening, traffic management).

 

The development shall be implemented in accordance with the duly approved Traffic Management Plan

 

Reason: To minimise the interference with the safety and free flow of traffic on the trunk road and to ensure that the transportation of abnormal loads will not have any detrimental effect on the trunk road network.

 

4.    No development or ground breaking works shall commence until a programme of archaeological works in accordance with a written scheme of investigation, has been submitted to and approved in writing by the Planning Authority in consultation with the West of Scotland Archaeology Service. The scheme shall be prepared by a suitably qualified person and shall provide for the recording, recovery and reporting of items of interest or finds within the application site. Thereafter the development shall be implemented in accordance with the duly approved details with the suitably qualified person being afforded access at all reasonable times during ground  ...  view the full minutes text for item 5

: