5 Transport Scotland Update PDF 87 KB
:
Minutes:
The Group gave consideration to
an update from Neil MacFarlane from Transport Scotland. The update advised that
road resurfacing would be getting carried out at the Rest and be Thankful from
the 31 May until the 11 June, with no works being carried out on Friday and
Saturday nights. Mr MacFarlane further advised that layby and cycleway
vegetation cut-backs had been carried out on the A82 Loch Lomondside
with more planned and Solar bollards had been installed at Loch Lomondside laybys and an overhaul of the brown and white
tourist signage at the same location is also in planning.
Decision
The Helensburgh and Lomond Area Community Planning Group considered and noted the information provided.
(Reference: Report by Transport Scotland, submitted)
: