TRANSPORT SCOTLAND
Update from Transport Scotland
:
Minutes:
Neil
MacFarlane from Transport Scotland provided the Forum with a verbal update.
Mr
MacFarlane advised that that road resurfacing would be getting carried out at
the Rest and Be Thankful from the 31 May until the 11 June, with no works being
carried out on Friday and Saturday nights. The update also highlighted that
layby and cycleway vegetation cut-backs had been carried out on the A82 Loch Lomondside with more planned and solar bollards had been
installed at Loch Lomondside laybys with an overhaul
of the brown and white tourist signage at the same location also in planning. It
was also noted that overnight resurfacing works would be taking place along the
A83 at Campbeltown during the summer.
Outcome
The
Forum noted the update.
:
TRANSPORT SCOTLAND
:
Minutes:
Neil
MacFarlane from Transport Scotland provided the Forum with a verbal update.
Mr
MacFarlane advised that there are two resurfacing projects which Transport
Scotland intend to carry out on the A83 near Cowal,
at Butterbridge and Honeymoon Bridge. He added that
both are overnight and under convoy traffic management so neither is overly
disruptive. Mr MacFarlane added that these works would be postponed if the Old
Military Road had to come in to operation.
Outcome
The
Forum noted the update.
: